New York Garage Shop – 2000


My Garage Shop Version 1

It finally happened. In my infinite wisdom I made the decision to finally do this in the winter following a week long cold spell. So the ground was frozen solid. Whats the first thing that has to be done. Dig a 60 foot x 3 foot deep trench to bury the electrical conduit. Enough talking the pictures say it all


Construction Begins
(click to enlarge)



Finally Completed
(click to enlarge)


 

 



MyGarageShop is a Wikipedia Contributor.